Wednesday, December 29, 2010

Levoy Theatre Update: December 29th 2010

Here is the latest report on the renovations of the Levoy Theatre in Millville New Jersey.  Please note the cool photos. I can not wait for this to open!!
Here are some updates for the Levoy. Despite the snow and cold the work continues. The roof decking is welded in place, the proscenium wall and stage roof steel are installed. Most, if not all, of the Helical pilings are installed, (the steel poles sticking out at odd lengths). The pilings will be cut to length soon and capped with steel. The area around the pilings will be framed with elaborate rebar and poured solid with concrete. These “piers” will hold steel plates designed to connect to the steel “I” beams that shape the floors and walls.
Pilings being placed underground.
Work Continues in the Dead of Winter.
Working on the Roof.

Construction started this past May. They are on schedule to open this coming Summer. Go to my blog where I have an archive of the history of this project from Millville City Commission to present. Its been a long road and the end is in sight. Congrats to Phil Van Embden and his daughter Lauren for making this project a reality!

No comments: