Wednesday, January 12, 2011

Levoy Theatre Update:Janurary 11 2011

Here is the latest from the Levoy.
At the advice of City of Millville and private engineers two bar Joists and One Large I beam were successfully removed from the roof of the Levoy on January 10th and 11th despite bitter cold and windy conditions. This operation was spearheaded by Garton Rigging who masterfully balanced the beams while simultaneously suspending workers from a second crane. This operation successfully reduced the risk of further collateral damage to surrounding structures and vastly improved the safety of conditions for the eventual demolition of the remaining debris and demolition of the old Belzers Bakery building. What seemed like an impossible task just days ago now seems like a problem whose solution is within sight.

1060725  Moving in to remove a damaged bar joist
1060734   Cutting steel roof decking
1060747   Disconnecting bracing to main beam
1060764   Flying main beam out of harms way
1060768   preparing to rest beam on high street.
Enhanced by Zemanta

No comments: