Monday, April 23, 2007

Wired

I spent yesterday (Sunday) working on the attac with Don and Dana. It was a beautiful Spring day in the real world but it was 95 degrees in my attac where we needed to pry the floorboards so Don could cut trenches for the electric wires that were lying on top of the floor joists. This was a pain cause we had to wedge our hammers under the plywood then check for wires. The trench had to be made for the wire so weight would not eventually fry the wires and cause a fire hazard. After that, the nails had to be pulled out and then then the plywood would have to be hammered in. It got done. HORRAY!!.

No comments: